Free Shipping on Qualifying Orders over $99 - Get Details

How Long Does It Take to Install an Inground Pool?

By Team Royal - Updated On: 09/24/24

Inground Pool Installation Timeframe

The installation of an inground pool involves several key stages, each contributing to the overall timeline. These stages include planning and obtaining permits, site preparation, excavation, plumbing and electrical work, and the actual pool installation. Each phase is integral to the project and plays a role in determining how long it will take to complete the installation.

Shop For Our Inground Pool Kits

 

Overview of the Inground Pool Installation Process

The installation of an inground pool involves several key stages, each contributing to the overall timeline. These stages include planning and obtaining permits, site preparation, excavation, plumbing and electrical work, and the actual pool installation. Each phase is integral to the project and plays a role in determining how long it will take to complete the installation.

Check Out Our Inground Pool Guide.

 

Detailed Timeline for Inground Pool Installation

Planning and Permits

  • Design Decisions: The first step is deciding on the pool’s size, shape, and materials, which is essential for creating a blueprint. Consider factors like the pool’s intended use, surrounding landscape, and personal preferences. This stage also includes selecting additional features such as waterfalls, lighting, or a spa, which can add to both the design complexity and installation time.
  • Permit Acquisition: Depending on local regulations, obtaining the necessary permits can vary significantly in time, often ranging from a few weeks to a couple of months. This step involves submitting detailed plans to local authorities, who will review them to ensure compliance with zoning laws, safety standards, and environmental regulations.  
  • Contractor Selection: Securing a reputable contractor is vital to the success of your project. This process involves researching potential contractors, reviewing their portfolios, checking references, and obtaining detailed quotes. Choosing the right contractor can also help streamline the permit process, as experienced contractors often have established relationships with local authorities.

    Need Help finding a pool builder? Check out our Pool Builder Program!

 

Site Preparation

  • Clearing the Site: Before excavation can begin, the site must be cleared of any obstacles, such as trees, shrubs, rocks, or old structures. This step ensures that there is a clean, unobstructed area for the pool and any necessary machinery. Depending on the site’s condition, this can take anywhere from a few days to a couple of weeks.
  • Site Access: Ensuring that excavation equipment and other machinery can easily access the site is another critical aspect of preparation. This may involve temporarily removing fences, widening driveways, or creating pathways. Poor site access can lead to delays or additional costs if special equipment is needed to navigate tight or difficult spaces.
  • Initial Ground Assessment: Before digging begins, an assessment of the soil and ground conditions is necessary. This includes checking for underground utilities, determining soil stability, and identifying any potential issues such as high water tables or rocky terrain. Addressing these factors upfront can prevent costly surprises during excavation.

 

Excavation

  • Excavation Process: The excavation of the pool is one of the most significant phases of the installation process. It typically takes 1-2 weeks, depending on factors such as pool size, soil type, and the efficiency of the excavation crew. The process involves digging the hole, shaping it according to the pool design, and hauling away the excavated soil.
  • Weather Impact: Weather can significantly impact the excavation timeline. Heavy rain can halt work and lead to water accumulation in the excavation site, requiring additional time to pump out. Cold temperatures may also slow down the process, especially if the ground freezes or becomes too hard to dig.
  • Soil Considerations: The type of soil on your property can affect both the time and complexity of the excavation. For example, rocky or clay-rich soils may require specialized equipment and more labor-intensive digging, while sandy soils may require additional support to prevent the walls from collapsing during excavation.

 

Plumbing and Electrical Work

  • Plumbing Installation: After the excavation, the plumbing systems for water circulation, filtration, and drainage are installed. This phase typically takes 1-2 weeks, depending on the pool’s size and complexity.
  • Electrical Systems: Installing the electrical systems is another critical step. This includes wiring for pool lighting, heating systems, and any automated features like pool covers or cleaning systems. The timeline for this phase can vary depending on the number of features and the complexity of the installation.
  • Do It Right the First Time: We highly recommend hiring licensed professionals. Poorly installed plumbing or electrical systems can lead to leaks, electrical hazards, or even complete system failures, resulting in costly repairs and delays.

 

Pool Installation

  • Concrete Pools: Concrete pools are typically the longest to install, often requiring 2-3 months. The process involves building a steel framework, spraying or pouring the concrete, and allowing it to cure. The curing process alone can take several weeks, during which time the concrete hardens and gains strength. After curing, the pool is plastered and finished according to the design specifications.
  • Vinyl Pools: Vinyl-lined pools are faster to install, generally completed within 4-8 weeks. The process involves assembling a prefabricated metal or plastic frame, laying the vinyl liner, and filling the pool. The liner must be carefully positioned to avoid wrinkles and ensure a smooth, durable finish. Vinyl pools are popular for their lower initial cost and faster installation time.
  • Fiberglass Pools: Fiberglass pools are the quickest option, often installed in as little as 3-4 weeks. These pools come pre-formed from the factory, and the installation involves placing the fiberglass shell into the excavated hole, leveling it, and connecting the plumbing. Because the shell is one solid piece, the installation is quicker and involves fewer steps than concrete or vinyl pools.

Get more detailed insight on your Complete Inground Pool Build.

 

Factors Influencing Inground Pool Installation Time

  • Pool Type: Concrete, vinyl, and fiberglass pools each have different installation timelines.
  • Weather Conditions: Rain, extreme temperatures, and other weather events can cause delays.
  • Contractor Schedules: Busy contractors may have longer wait times before starting your project.
  • Unexpected Challenges: Issues such as difficult soil conditions or permit delays.

 

Inground Pool Installation Common Delays and How to Avoid Them

  • Permit Delays: Start the permit process early to avoid waiting.
  • Weather-Related Delays: Plan for potential weather interruptions by scheduling flexible timelines.
  • Supply Chain Issues: Order materials early to avoid delays due to shortages.
  • Contractor Availability: Book your contractor well in advance, especially during peak seasons.

 

Choosing the Right Contractor For Inground Pool Installation

  • Check Credentials: Ensure the contractor is licensed, insured, and experienced with inground pools.
  • Review Past Work: Ask for a portfolio or references to gauge the quality of their work.
  • Read Reviews: Look for reviews and testimonials from past clients.
  • Request a Detailed Quote: Understand all costs and timelines before committing.

Read more about How To Choose A Pool Builder.

 

Conclusion

Understanding the timeline for installing an inground pool is crucial for a smooth and successful project. By planning effectively and choosing the right contractor, you can minimize delays and ensure that your pool installation proceeds as expected.

 

How Long Does It Take To Install an Inground Pool - Frequently Asked Questions

  • What is the quickest type of inground pool to install?

    Fiberglass pools are typically the quickest to install, often completed in 3-4 weeks.

  • How can I expedite the permit approval process?

    Start early, ensure all documentation is complete, and work with a contractor familiar with local regulations.

  • What happens if it rains during the installation?

    Rain can delay certain stages like excavation and concrete pouring; most contractors will wait for favorable weather to continue.

  • How much does weather affect pool installation times?

    Weather can significantly impact timelines, especially during excavation and construction stages.

  • Can installation begin in winter?

    Yes, but weather conditions may extend the timeline. Winter pool installation considerations might be necessary.

READY TO RELAX? DESIGN YOUR DREAM POOL TODAY.

BUILD YOUR POOL

Comments